shower, bath,sink and toilet to be removed and replaced by steam shower, toilet,sink and slipper bath. laminate flooring to be removed and tiled, walls to be tiled to 3/4 and rest of walls to be skimmed for painting. ceiling to be re-plastered and coving removed and 4 spotlights to be fitted. new header tank to be supplied and fitted and 3 bar pump needed for steam shower. mirror with light to be fitted plus extractor fan to be fitted.
James and his team are very friendly and professional and the standard of work is excellent. i wouldn't hesitate to recommend them to anyone and would definitely use them again.
These images are taken before the bathroom was finished hence the loose cables etc. Jeff was really happy with the work and gave us a 5 Star rating.
|
|
|
| |
|
|
|
| |